Projects
Camden Valley Way, Catherine Field
Civil Certification was engaged by Metro Property Development to provide a DA stage Stormwater Management Report in support of a proposed 10ha residential development located within the Camden Growth Centre. Our work involved assessment of flooding, water quality and detention requirements and included MUSIC
Cobaki Central Open Space (Tweed Shire)
Civil Certification was engaged by Leda Development as the subdivision stage Principal Certifying Authority (PCA) for a future 500ha residential site located immediately to the south of the NSW/Queensland border. Planning approval was granted by the NSW Government for the 1st stage of the
Little Bay Sydney
Civil Certification provided detailed civil & structural engineering design and inspection services for all water management infrastructure constructed as part of this 13.6ha residential subdivision in the LGA of Randwick. Notable elements of the design include stormwater treatment ponds, a constructed wetlands, bio-retention systems,
Penrith Lakes Weir 3
Civil Certification provided engineering inspection and accredited certifying services for the Penrith Lakes Development Corporation (PLDC) during construction of a large flood mitigation weir adjoining the Nepean River as part of the Penrith Lakes development site. The project was valued at $11 million dollars
Lachlan’s Line, Macquarie Park (North Ryde Station Precinct)
Civil Certification was engaged by NSW Urban Growth as the subdivision stage Principal Certifying Authority (PCA) for this 9ha residential site in the LGA of Ryde that will ultimately provide residential housing for 5000 residents. The project is a transit orientated development located 15km